NEW CAPITAL SUBSTATION

NEW CAPITAL SUBSTATION

Project Highlights

Year Completed
2022
Location
New Administrative Capital
Industry Segment
Energy Sector
System Implemented
WATER SPRAY

Compliance & Approvals

Civil DefenseISO 9001:2015Quality MarkNFPA Compliant

Comprehensive Engineering Case Study

Energy Sector — Critical Power Protection

Automatic water spray system for 500kV transformers ensuring rapid cooling and suppression.

The Technical Challenge

Protecting strategic 500kV oil-filled transformers in a high-density urban infrastructure project. The risk of oil explosions and cascaded failure required an immediate response system.

The Engineered Solution

Designed a Deluge Water Spray System utilizing galvanized steel piping rings surrounding each transformer. High-velocity nozzles are strategically aimed to cool the transformer tank and extinguish oil fires simultaneously. Activated by linear heat detection cables.

Operational Result & Impact

System successfully effectively isolates fire risks, preventing catastrophic damage to the grid backbone. Commissioned ahead of schedule to support the New Capital's inauguration.

Technologies & Equipment Installed

Deluge Valve SetsHigh Velocity NozzlesLinear Heat Detection
Meteory Certified Industrial Installation