Meteory

EL-BURULLUS POWER PLANT

EL-BURULLUS POWER PLANT

Project Highlights

Year Completed
2018
Location
Kafr El Sheikh, Egypt
Industry Segment
Energy Sector
System Implemented
CO2 SYSTEMS

Compliance & Approvals

Civil DefenseISO 9001:2015Quality MarkNFPA Compliant

Comprehensive Engineering Case Study

Energy Sector — Critical Power Protection

Design and installation of high-pressure CO2 systems for turbine enclosures and transformer protection in one of the world's largest combined-cycle power plants.

The Technical Challenge

Protecting 12 gas turbines and critical electrical infrastructure in a high-temperature, high-vibration coastal environment where saltwater corrosion is a constant threat.

The Engineered Solution

Implemented a redundant High-Pressure CO2 system using seamless steel cylinders with marine-grade electrostatic coating (RAL 3000). The system features zoned release valves and integrated heat detection to ensure rapid suppression without thermal shock to the turbines.

Operational Result & Impact

Achieved 100% successful commissioning tests with discharge times under 60 seconds. The installation passed all Civil Defense and NFPA 12 compliance checks, securing continuous power generation for 4.8 GW capacity.

Technologies & Equipment Installed

High-Pressure CO2Heat DetectionZoned Release Control
Meteory Certified Industrial Installation