NEW CAPITAL SUBSTATION

NEW CAPITAL SUBSTATION

Points Forts du Projet

Année de Réalisation
2022
Emplacement
New Administrative Capital
Segment Industriel
Industriel
Système Installé
WATER SPRAY

Conformité et Approbations

NFPA CompliantCertifié Défense CivileMarque de Qualité ÉgyptienneISO 9001:2015

Étude de Cas d'Ingénierie Complète

Secteur Énergie — Protection des Sites Critiques

Automatic water spray system for 500kV transformers ensuring rapid cooling and suppression.

Le Défi Technique

Protecting strategic 500kV oil-filled transformers in a high-density urban infrastructure project. The risk of oil explosions and cascaded failure required an immediate response system.

La Solution d'Ingénierie

Designed a Deluge Water Spray System utilizing galvanized steel piping rings surrounding each transformer. High-velocity nozzles are strategically aimed to cool the transformer tank and extinguish oil fires simultaneously. Activated by linear heat detection cables.

Résultat et Impact Opérationnel

System successfully effectively isolates fire risks, preventing catastrophic damage to the grid backbone. Commissioned ahead of schedule to support the New Capital's inauguration.

Technologies et Équipements Installés

Deluge Valve SetsHigh Velocity NozzlesLinear Heat Detection